The Atomic Energy Regulatory Board (AERB) is the national regulator for radiation safety in India, established under the Atomic Energy Act, 1962. AERB regulates every source of ionising radiation used in medicine, industry, research and consumer products — medical X-ray machines, CT scanners, PET-CT machines, mammography units, dental X-rays, industrial radiography devices, gamma-radiation gauges, security scanners at airports, and even luminous exit signs. Anyone importing, manufacturing, installing, using or decommissioning such equipment in India needs AERB approval — typically through Type Approval for the equipment model and a separate Licence for the facility using it.
The Exim Roof runs an AERB practice that has taken hospitals, imaging centres, industrial-radiography firms and equipment importers through the eLORA (e-Licensing of Radiation Applications) portal since 2014. From Type Approval of new X-ray machines through Layout Approval of imaging suites, Radiation Safety Officer (RSO) appointment and licence renewals, we take end-to-end ownership.
AERB approvals — the full stack
- Type Approval — model-wise approval of the radiation-generating equipment. Required before import or sale.
- Import Licence — permission to import a specific quantity of Type-Approved equipment.
- Layout Approval — approval of the room / suite layout to ensure radiation shielding is adequate.
- Institutional Registration — registration of the facility that will use the equipment.
- Licence for Operation — permission to actually operate the equipment.
- RSO (Radiation Safety Officer) approval — mandatory qualified personnel to oversee radiation safety.
- Decommissioning — permission to safely decommission and dispose of the equipment / source.
Regulatory framework
AERB approvals are administered under the Atomic Energy (Radiation Protection) Rules, 2004 and the various Safety Codes issued by AERB — including AERB/SC/MED-2, MED-4 and MED-5 for medical diagnostic X-ray, radiotherapy and nuclear medicine equipment. Applications are filed on the eLORA portal and go through a technical-safety review by AERB officers.
The Type Approval process
Stage one is manufacturer authorisation — the applicant (typically an Indian distributor or subsidiary) must hold formal authorisation from the equipment manufacturer. Stage two is technical documentation — datasheet, radiation-output specifications, tube type, filtration, generator specifications, safety-interlock design, mAs / kV range and cabinet design. Stage three is application filing on eLORA with fee payment. Stage four is AERB technical review. Stage five is grant of Type Approval, valid for the life of the model unless withdrawn.
Layout Approval and Facility Licence
A hospital or imaging centre installing an X-ray or CT machine must obtain Layout Approval based on architectural drawings showing walls, doors, viewing windows and shielding materials (lead thickness). AERB reviews the drawings against the Safety Code and either approves or asks for design modifications. Once the equipment is installed and commissioning tests are complete, the facility applies for the Licence for Operation with the RSO details and radiation-monitoring plan.
How The Exim Roof helps
- Type Approval application for imported / manufactured radiation-generating equipment.
- Import Licence for each shipment.
- Layout Approval with shielding design and drawing preparation.
- Institutional Registration and Licence for Operation.
- RSO shortlisting and approval application.
- Renewals and decommissioning support for the life of the equipment.
AERB Certification Process — Step by Step
- 1
Step 1: Free Consultation
A no-obligation 20-minute call to understand your product, project, market and the exact approvals you need.
- 2
Step 2: Document Preparation
Our specialists prepare, review and vet every document so your application clears the portal in the first submission.
- 3
Step 3: Portal Filing & Fee Payment
We handle the online application, government fee payment and coordinate with test labs / auditors where required.
- 4
Step 4: Department Liaison
Continuous follow-up with the concerned authority, response to queries and any additional information sought.
- 5
Step 5: Certificate / Approval Grant
Once approved, the certificate is delivered to you along with a compliance calendar for renewals and returns.
Documents Required for AERB Certification
- PAN of the applicant / company
- GST registration certificate
- Certificate of Incorporation / partnership deed
- Product details, technical write-up or project report
- Authorised signatory ID proof (Aadhaar / passport)
- Address proof of manufacturing unit or office
- Equipment datasheet, radiation-output specification and safety-interlock design
- Manufacturer authorisation letter for the applicant
- Facility layout with shielding calculation
- Radiation Safety Officer qualification and approval status
- Room-plan drawings and material specifications
Why Choose The Exim Roof for AERB Certification
- Type approval
- Import license
- Facility layout review
Frequently Asked Questions
- How long does the entire process take?
Most approvals are granted in 30–90 days once documentation is in order. Timelines vary by department, product category and testing requirements — we share a milestone-based plan on day one.
- Do you handle end-to-end filing?
Yes. Our team drafts the application, uploads it on the government portal, pays the fee (against invoice), coordinates with labs / auditors and follows up till the certificate is granted.
- Will you help with renewals and post-approval compliance?
Absolutely. We share a compliance calendar with due dates for renewals, annual returns and periodic filings. You will never miss a deadline.
- Can I use imported X-ray equipment without AERB Type Approval?
No. Any radiation-generating equipment used in India must be Type-Approved by AERB. Customs will not clear the consignment without an AERB import licence, and the facility cannot lawfully operate the equipment without a Licence for Operation.
- Who can act as a Radiation Safety Officer?
An RSO must hold the appropriate qualification (typically a graduate degree in physics or radiography) and must have completed the AERB RSO-certification course for the applicable category (diagnostic radiology, radiotherapy, industrial radiography, etc.).
- How long is an AERB licence valid?
Type Approval is granted for the life of the equipment model. Licence for Operation is typically granted for five years and renewable, subject to satisfactory radiation-safety records and RSO continuity.
AERB Certification: Complete consultancy, documentation and approval support
What this certification service covers
AERB Certification is not just a form-filling exercise. It is a structured compliance workflow where eligibility, correct documentation and accurate authority submissions directly influence approval timelines. Our team at The Exim Roof handles the full journey from requirement mapping to final submission so businesses can avoid repetitive objections and costly delays. If you are searching for certification consultant india or regulatory approval support, this page is designed to answer practical questions with implementation-level clarity.
Every assignment begins with a use-case assessment: product category, operating model, transaction flow, applicable authority and reporting obligations. We then build a customised documentation plan so your filing package is complete before submission. This process is especially useful for founders, importers, manufacturers, finance teams and compliance managers who need predictable execution instead of fragmented vendor coordination.
Who should apply for AERB Certification and when
You should initiate AERB Certification support before commercial launch, product dispatch, market entry or tender participation—whichever comes first in your workflow. Early planning reduces business risk because eligibility gaps, product classification issues, signer mismatches and authority-specific checklist errors are discovered before your filing clock starts. For businesses operating in regulated sectors, proactive compliance planning also improves partner confidence during due diligence and onboarding.
This service is relevant for startups scaling into regulated categories, established companies expanding to new SKUs or states, overseas entities entering India and businesses responding to notices. If your team is comparing timelines across multiple approvals, we can sequence this engagement with related deliverables through our consolidated service catalogue, so dependencies are addressed in the right order.
Documents, process timeline and approval checkpoints
Most applications fail on documentation consistency rather than intent. Typical document sets include PAN of the applicant / company, GST registration certificate, Certificate of Incorporation / partnership deed, Product details, technical write-up or project report, Authorised signatory ID proof (Aadhaar / passport), Address proof of manufacturing unit or office. We review each document for naming consistency, address alignment, validity windows and authority-specific declaration language. This reduces technical defects that commonly trigger re-submissions.
A standard execution sequence looks like this: Free Consultation -> Document Preparation -> Portal Filing & Fee Payment -> Department Liaison. Timeline depends on authority turnaround, applicant readiness and technical complexity, but a well-prepared file always moves faster than a reactive one. Throughout execution, we share status notes, action items and query responses so internal stakeholders have full visibility.
Cost planning is equally important. Budget usually varies based on scope depth, number of SKUs/entities, urgency, testing dependencies and post-approval obligations. During onboarding, we provide clear scope boundaries and execution milestones so commercial expectations remain transparent from day one.
Why businesses choose The Exim Roof for AERB Certification
Clients usually work with us for three reasons: contextual advisory, disciplined execution and accountability in communication. Our delivery model combines legal/compliance interpretation with operational support, so business teams understand both the "what" and the "why" behind each requirement. In practical terms, this means fewer surprises, faster responses and cleaner submissions.
Our recent assignments have highlighted the same value points repeatedly: Type approval, Import license, Facility layout review. We also publish process explainers and regulatory updates to help decision-makers evaluate compliance implications before they commit resources.
If you want a realistic timeline and document checklist for your case, we can assess your requirement, share next steps and align the service plan to your target launch window.
Explore related offerings in our complete services catalogue, read practical updates on our compliance blog, or begin immediately with an online enquiry. For urgent discussions, you can also reach our team through the contact page.
Need more information about AERB Certification?
Fill in the form below and our compliance team will get back to you within one business day.
You may also need
All services →BIS FMCS Certification
End-to-end consultancy for Foreign Manufacturers Certification Scheme (FMCS) under the Bureau of Indian Standards.
BIS Scheme X Certification
Consultancy for the new BIS Scheme X applicable to machinery and electrical equipment safety.
Bureau of Indian Standards (BIS) Certification
ISI mark and product certification support across the notified schedules of the BIS Act.
STQC Certification
Standardisation Testing and Quality Certification support for electronics, IT and cyber security products.